These are before and after pictures of an elementary school ballfield, where the outside grandstand area needed to be raised so spectators could watch the game a little more comfortably. I trucked in and placed about 350 loads of fill dirt , moved the slope out about 30' and graded it out, raising the whole area about 4'. "Play Ball"
This was a job in 2004 that required the removal of large trees, installation of pipe for drainage and approx. 800 loads of fill dirt trucked in. As you can see in the first two pictures, it was quite a deep ravine. Once filled and graded (last picture), it made for a very nice pasture area that the owner fenced in and now uses to hold horses.
This is the lastest dumpsite I started last November. It will still hold approx. 600-700 loads of dirt. Call me if you need a place to dump your material. Have a great New Year in 2011.